• 13.670 sqm Reinforced Concrete Construction Area
  • 3.880 sqm Open Construction Area
  • 360 ton Steel Works
  • All Waterproofing Works
  • All M&E Works,
  • Olympic Swimming Pool with Pre-Fabricated Panels
  • 3 Squash Courts
  • Basketball Pitch
  • Multi-Purpose Gymnastic Areas
  • SPA Facilities

Olympic pool to be used for water polo competitions and other aquatic disciplines at the Aquatic Sports Centre on the Maltese island of Gozo.

The pool will be 50 m x 25 m in size with a depth of between 2.2 m and 3 m. The system selected for the project is Skypool, which is a technological solution patented by Fluidra consisting of prefabricated hot galvanized steel panels secured to a concrete block which are then covered in PVC-P sheeting.

In addition to the Olympic pool, the centre will also have a multipurpose community pool and will be adjacent to another sports complex currently under development, which will have a 500m2 gym and other ancillary facilities, including a first aid room.

Main Contractor:  Excel Sis & Excel System

CLIENT:
The Ministry for Gozo of the Government of Malta
project type:
Superstructure
LOCATION:
Gozo - Malta
SCOPE:
Structural & Architectural Finishing Works,

Pool Systems & Electromechanical Works


Status:
On-Going
dURATION:
24 Months
(2020-2023)