January 2020 – September 2022 :
COMPLETED AREA – FINISHED SURFACE 430.234,01 m2TOTAL ASPHALT TONNAGE 104.592,10 tonTOTAL CONCRETE M3 44.500,00 m3TOTAL POTABLE LINE 20.000,00 mrunTOTAL SEWER LINE 5.000,00 mrun
Main Contractor: Excel Sis
Infrastructure Projects