• Demolition of the Existing Jetty
  • Dredging of Sea Bed
  • Precast Block Works
  • Construction of 5 mt width and 55 mt long Jetty

Main Contractor:  Excel Sis

CLIENT:
Infrastructure Malta
project type:
Marine works
LOCATION:
St.Thomas Bay Malta
SCOPE:
Jetty and rainforced concrete works
Status:
Completed
dURATION:
5 Months (2020)